Transformer #1
Parameter Assesment Value Status
Reliability
Number of Years of Installation8
Maintainability Number of Operational Hours1200
Reliability Number of Switching operations500
MaintainabilityDiscontinued / upgraded  by OEM No
Maintainability OEM's  inability to support on SpareNo
Maintainability Challenges for Availability of the Spare partsNo
Reliability
Frequent Failures or BreakdownYes
Maintainability Challenges in Getting Service Support from OEMNo
Safety , Compliance Saftey hazard or non compliance to local rules and regulationComplies
Reliability Preventive Maintenance FindingsHealthy
Remote Monitoring Remote monitoringYes
 
Group Field Value User Modified
ElectricalOil Dissolved Gas Analysis Test zSatheesh Kumar11-Nov-2021
VisualTerminal Loose connection and tighteneing as reqdzSatheesh Kumar01-Nov-2021
ElectricalBay contact resistance testySatheesh Kumar22-Oct-2021
PMDate of last Oil DGA testySatheesh Kumar12-Oct-2021
HistoryMajor Repairs carried out xSatheesh Kumar02-Oct-2021
PMHealth Checkup carried out by (Vendor name)xSatheesh Kumar22-Sep-2021
ElectricalOLTC / RTCC Inspection and Testing xSatheesh Kumar12-Sep-2021
HistoryMajor Repairs carried out xSatheesh Kumar02-Sep-2021
ElectricalTransformer % LoadingxSatheesh Kumar23-Aug-2021
VisualSilica Gel Breather inspection ySatheesh Kumar13-Aug-2021
ElectricalInsulation Resistance MeasurementxSatheesh Kumar03-Aug-2021
ElectricalInsulation Resistance MeasurementxSatheesh Kumar24-Jul-2021
ElectricalOLTC / RTCC Inspection and Testing xSatheesh Kumar14-Jul-2021
HealthMaintenance / Service Action Required zSatheesh Kumar04-Jul-2021
DetailsEquipment Under AMC ySatheesh Kumar24-Jun-2021
HealthEquipment life left as per OEMxSatheesh Kumar14-Jun-2021
HistoryMajor Spare replacement zSatheesh Kumar04-Jun-2021
HealthEquipment life left based on PM checks, feedback from OEM etcySatheesh Kumar25-May-2021
DetailsEquipment Under WarrantyxSatheesh Kumar15-May-2021
ElectricalDielectric Frequency Responses (DFR Test).zSatheesh Kumar05-May-2021
ElectricalN2 Based Fire Fighting System Checking / Testing xSatheesh Kumar25-Apr-2021
ElectricalMagnetic Balance TestySatheesh Kumar15-Apr-2021
ElectricalHumming and vibration test.zSatheesh Kumar05-Apr-2021
PMDGA carried out by (Vendor name)zSatheesh Kumar26-Mar-2021
HistoryAvilaibility of Spares ySatheesh Kumar16-Mar-2021
ElectricalNoise Level measurement ySatheesh Kumar06-Mar-2021
HealthEquipment life left based on PM checks, feedback from OEM etcySatheesh Kumar24-Feb-2021
ElectricalCalculation of Transformer Efficiency @ 50% , 75% , 100% Loads ySatheesh Kumar14-Feb-2021
VisualHV / LV Cable Box & Termination InspectionxSatheesh Kumar04-Feb-2021
HistoryMajor faults occurredySatheesh Kumar25-Jan-2021
ElectricalDielectric Frequency Responses (DFR Test).zSatheesh Kumar15-Jan-2021
PMDate of last Oil DGA testySatheesh Kumar05-Jan-2021
ElectricalPotential Discharged / Acoustic Emission  (PD/AE Test).ySatheesh Kumar26-Dec-2020
ElectricalWinding Temperature measurement zSatheesh Kumar16-Dec-2020
ElectricalCalculation of Transformer Efficiency @ 50% , 75% , 100% Loads ySatheesh Kumar06-Dec-2020
DetailsEquipment Under WarrantyxSatheesh Kumar26-Nov-2020
ElectricalPhase Currents measurements zSatheesh Kumar16-Nov-2020
ElectricalPotential Discharged / Acoustic Emission  (PD/AE Test).ySatheesh Kumar06-Nov-2020
VisualSilica Gel Breather inspection ySatheesh Kumar27-Oct-2020
ElectricalTransformer % LoadingxSatheesh Kumar17-Oct-2020
HealthEquipment life left as per OEMxSatheesh Kumar07-Oct-2020
VisualTransformer Oil Lekages InspecationzSatheesh Kumar27-Sep-2020
HistoryPreventive Maintenance / Health Check up Schedule Frequency xSatheesh Kumar17-Sep-2020
HistoryAviability of Service support by OEM / Contractor zSatheesh Kumar07-Sep-2020
ElectricalOil Dissolved Gas Analysis Test zSatheesh Kumar28-Aug-2020
HistoryMajor faults occurredySatheesh Kumar18-Aug-2020
PMDGA carried out by (Vendor name)zSatheesh Kumar08-Aug-2020
ElectricalOil Temperature measurement xSatheesh Kumar29-Jul-2020
DetailsEquipment Under AMC ySatheesh Kumar19-Jul-2020
PMHealth Checkup carried out by (Vendor name)xSatheesh Kumar09-Jul-2020
ElectricalNoise Level measurement ySatheesh Kumar29-Jun-2020
ElectricalOil Temperature measurement xSatheesh Kumar19-Jun-2020
VisualHV / LV Cable Box & Termination InspectionxSatheesh Kumar09-Jun-2020
ElectricalLA Checking / Testing zSatheesh Kumar30-May-2020
HistoryAviability of Service support by OEM / Contractor zSatheesh Kumar20-May-2020
ElectricalHumming and vibration test.zSatheesh Kumar10-May-2020
ElectricalTransformer Oil Breakdown voltage (BDV)ySatheesh Kumar30-Apr-2020
ElectricalSweep Frequency Response Analysis (SFRA Test).xSatheesh Kumar20-Apr-2020
ElectricalWinding Temperature measurement zSatheesh Kumar10-Apr-2020
HistoryPreventive Maintenance / Health Check up Schedule Frequency xSatheesh Kumar31-Mar-2020
ElectricalPhase Currents measurements zSatheesh Kumar21-Mar-2020
VisualTerminal Loose connection and tighteneing as reqdzSatheesh Kumar11-Mar-2020
VisualTransformer Oil Lekages InspecationzSatheesh Kumar01-Mar-2020
HistoryMajor Spare replacement zSatheesh Kumar20-Feb-2020
HistoryAvilaibility of Spares ySatheesh Kumar10-Feb-2020
HealthMaintenance / Service Action Required zSatheesh Kumar31-Jan-2020
ElectricalLA Checking / Testing zSatheesh Kumar21-Jan-2020
ElectricalSweep Frequency Response Analysis (SFRA Test).xSatheesh Kumar11-Jan-2020
ElectricalMagnetic Balance TestySatheesh Kumar01-Jan-2020
ElectricalBay contact resistance testySatheesh Kumar22-Dec-2019
ElectricalTransformer Oil Breakdown voltage (BDV)ySatheesh Kumar12-Dec-2019
ElectricalN2 Based Fire Fighting System Checking / Testing xSatheesh Kumar02-Dec-2019